Woodland Meadows Landfill Cell 13 & 15
Landfill Cell Construction & Capping
Project Details
Developer:
Waste Management
Engineer:
McNeely Lincoln
Location:
Wayne, MI
Work Scope
70 acres of total landfill cell construction
7,400 linear feet of silt fence installation
152,000 cubic yards of topsoil stripping
1,400,000 cubic yards of clay excavation
25,000 cubic yards of pond demucking
100,000 tons of drainage material placement
3,000 linear feet of 8” pvc perforated leachate collection pipe
6,000 linear feet of 8” SDR11 HDPE pipe on cell floor
Gas header pipe installation and valve vaults
All storm structures and pond discharge structures