Project Force – Amazon Distribution Warehouse
Warehouse & Distribution Site Grading
Project Details
Developer:
Ryan Companies
Engineer:
Thomas Reisdorf, Ulteig Engineering, Inc.
Location:
Fargo, ND
Work Scope
120 acre site warehousing distribution facility
1,100,000 square foot building
8,600 linear feet of silt fence
190,000 cubic yards of topsoil stripping
60,000 cubic yards of topsoil respread
100,000 cubic yards of sand excavation from stockpile
150,000 cubic yards of clay excavation to structural fill
220,000 cubic yards of clean sand imported for structural fill material
Lime stabilization
Structural excavation
Underground package
Stone the building pad
Complex dewatering and drainage system
Fine grading and backfill of curbs